1 sq ft Land For Sale, Northstowe CB24, £750,000
3 photos
Property ID: 155820
£750,000 Freehold
Plot 6 Northstowe Phase 1, Pathfinder Way, Northstowe, Cambridgeshire, CB24 1FD
Type
Land
Status
SOLD STC
Size
1 sq ft / 0 sq m
Skip the agent. Advertise it on
Boxpod for £12/m Find out more
Description
The site consists of a cleared plot with level topography and of regular shape. The plot size totals 1.15 acres (0.47 Ha). A fly through of the site is available here: https://youtu.be/v-cuORDQSRU.
Offers invited on both an unconditional and subject to planning basis.
The site is located in the heart of Northstowe, a new town currently being developed in the South Cambridgeshire District, which will provide in excess of 10,000 new homes when complete.
The Town is located approximately 6.3 miles northwest of Cambridge City Centre. Long Stanton Park and Ride is less than 400m away, providing regular direct services to Cambridge (25 mins). Northstowe is situated in close proximity to junction 25 of the A14, which provides access to the wider national road network via the M11 (4.4 miles).
Northstowe has seen over 1,750 residences complete to date, with current local amenity offerings including an interim Community Centre, Northstowe Tap and Social (bar, bakery and café) and Northstowe Secondary College.
Offers invited in excess of £750,000
Offers for the freehold are invited on either an unconditional or subject to planning basis.
TBC
Proposed developments should comprise a mixed-use scheme, with plot 6 having previously formed part of the outline planning permission for Northstowe Phase 1 (S/0388/12/OL). A new full application would therefore be required. The extent of the Local Centre is illustrated on the approved Phase 1 Parameter Plans, which refer to 'Mixed use/Local Centre' (S.0932/14/NM).
A pre-application enquiry has been made to establish planning principles for the site.
Any new application for the Local Centre is expected to be determined against the adopted South Cambridgeshire Local Plan (2018) and Northstowe Area Action Plan (2007).
Relevant applications relating to site history include:
S/0338/12/OL - Outline planning permission for Northstowe Phase 1
S/0932/14/NM - Amendment to Phase 1 Parameter Plans
23/03248/REM - Reserved Matters approval for the Community Centre
Each party to be responsible for the payment of their own legal costs.
Strictly by appointment with agents.
Offers invited on both an unconditional and subject to planning basis.
The site is located in the heart of Northstowe, a new town currently being developed in the South Cambridgeshire District, which will provide in excess of 10,000 new homes when complete.
The Town is located approximately 6.3 miles northwest of Cambridge City Centre. Long Stanton Park and Ride is less than 400m away, providing regular direct services to Cambridge (25 mins). Northstowe is situated in close proximity to junction 25 of the A14, which provides access to the wider national road network via the M11 (4.4 miles).
Northstowe has seen over 1,750 residences complete to date, with current local amenity offerings including an interim Community Centre, Northstowe Tap and Social (bar, bakery and café) and Northstowe Secondary College.
Offers invited in excess of £750,000
Offers for the freehold are invited on either an unconditional or subject to planning basis.
TBC
Proposed developments should comprise a mixed-use scheme, with plot 6 having previously formed part of the outline planning permission for Northstowe Phase 1 (S/0388/12/OL). A new full application would therefore be required. The extent of the Local Centre is illustrated on the approved Phase 1 Parameter Plans, which refer to 'Mixed use/Local Centre' (S.0932/14/NM).
A pre-application enquiry has been made to establish planning principles for the site.
Any new application for the Local Centre is expected to be determined against the adopted South Cambridgeshire Local Plan (2018) and Northstowe Area Action Plan (2007).
Relevant applications relating to site history include:
S/0338/12/OL - Outline planning permission for Northstowe Phase 1
S/0932/14/NM - Amendment to Phase 1 Parameter Plans
23/03248/REM - Reserved Matters approval for the Community Centre
Each party to be responsible for the payment of their own legal costs.
Strictly by appointment with agents.
Location
Advertisement
Carter Jonas LLP
View all properties
Similar units nearby
Make an Enquiry
Carter Jonas LLP





