Industrial Unit To Let, Ferrybridge
4 photos
POA
Mountpark Ferrybridge,Kirkhaw Lane, Ferrybridge, WF11 8UL
Type
Industrial Unit
Status
Check Availability
Size
40,000 - 640,000 sq ft
Property Details
Mountpark Ferrybridge Will Be West Yorkshire's Premier Industrial And Logistics Campus And Will Be The Company's Third Development In West Yorkshire. Set Over 110 Acres The Site Benefits From Planning Consent For Up To 1,640,000 Sq Ft Of Industrial And Logistics Accommodation.
Site Infrastructure And Enabling Works Are Underway To Create A Vertical-ready Central Development Plot For Summer 2026. At The Same Time Two Reserved Matters Applications Have Been Submitted For This Plot; A Single Cross-dock Logistics Facility Of 640,000 Sq Ft And A 3-unit Scheme
Ranging Between 70,000 Sq Ft And 330,000 Sq Ft. These Applications Will Be Determined In Q1 2026 Providing Our Customers With A Range Of Building Sizes To Choose From To Commence As Soon As Enabling Works Are Complete.
A Pre-lease Of 68,500 Sq Ft Has Been Secured And A 40 Acre Parcel Of Land Is Under Offer As Shown On The Plan Inset. Unit 1, A 40,000 Sq Ft Logistics Facility Is Under Construction On A Speculative Basis And Is Targeted For Completion In Q4 2026. Click Here For The Unit 1 Brochure.
Mountpark Ferrybridge Builds Upon The Next Generation Of Specifications And Building Practices Such As Carbon Net-zero Capabilities, Target Breeam
'outstanding' Credentials And An Emphasis On Staff Wellness, Which Will Make It A Market-leading Campus.
Key Aspects Of The Development Are:
- Flexibility To Provide 40,000 Sq Ft Up To 640,000 Sq Ft
- 12-18m Haunch Height
- Level Access, Dock And Eurodock Doors To Each Unit
- Significant Power Supply
- Extensive Ev Charging
- 50knm2 Floor Loading
- Units Available As Early As Q4 2026
Site Infrastructure And Enabling Works Are Underway To Create A Vertical-ready Central Development Plot For Summer 2026. At The Same Time Two Reserved Matters Applications Have Been Submitted For This Plot; A Single Cross-dock Logistics Facility Of 640,000 Sq Ft And A 3-unit Scheme
Ranging Between 70,000 Sq Ft And 330,000 Sq Ft. These Applications Will Be Determined In Q1 2026 Providing Our Customers With A Range Of Building Sizes To Choose From To Commence As Soon As Enabling Works Are Complete.
A Pre-lease Of 68,500 Sq Ft Has Been Secured And A 40 Acre Parcel Of Land Is Under Offer As Shown On The Plan Inset. Unit 1, A 40,000 Sq Ft Logistics Facility Is Under Construction On A Speculative Basis And Is Targeted For Completion In Q4 2026. Click Here For The Unit 1 Brochure.
Mountpark Ferrybridge Builds Upon The Next Generation Of Specifications And Building Practices Such As Carbon Net-zero Capabilities, Target Breeam
'outstanding' Credentials And An Emphasis On Staff Wellness, Which Will Make It A Market-leading Campus.
Key Aspects Of The Development Are:
- Flexibility To Provide 40,000 Sq Ft Up To 640,000 Sq Ft
- 12-18m Haunch Height
- Level Access, Dock And Eurodock Doors To Each Unit
- Significant Power Supply
- Extensive Ev Charging
- 50knm2 Floor Loading
- Units Available As Early As Q4 2026
Location
Carter Jonas LLP
View all properties
Make an Enquiry
Carter Jonas LLP